Documentation
In this page, you will find all the manuals needed to prepare and analyze your observations with HAWK-I. Please be sure to download the needed document corresponding to the period in which the observations will take place.
All the manuals are in Adobe's Acrobat format.
- HAWK-I User's Manual
All the information about the instrument itself, its modes and their characteristics.
- Period 114, to be used for Period 114 Phase 2 proposal preparation, and P115 Phase 1 proposal preparation.
- Period 113, to be used for Period 113 Phase 2 proposal preparation, and P114 Phase 1 proposal preparation.
- Period 111, to be used for Period 111 and 112 Phase 1 and 2 proposal preparation (no changes in P112 and Phase 1 of P113)
- Period 110, to be used for Period 110 Phase 1 and 2 proposal preparation
- Period 109, to be used for Period 109 Phase 1 and 2 proposal preparation
- Period 108, to be used for Period 108 Phase 1 and 2 proposal preparation
- Period 107, to be used for Period 107 Phase 2 and DDT proposal preparation.
- Period 106, to be used for Period 106 Phase 1 and 2 proposal preparation.
- Period 105, to be used for Period 105 Phase 1 and 2 proposal preparation.
- Period 104, to be used for Period 104 Phase 1 and 2 proposal preparation.
- Period 103, to be used for Period 103 Phase 1 and 2 proposal preparation.
The main modification concerns the performance with GRAAL+HAWK-I. - Period 102, to be used for Period 102 Phase 1 and 2 proposal preparation.
The main modification concerns the availability to observe with GRAAL+HAWK-I in Tip-Tilt free mode (hence to obtain Ground Layer Adaptive Optic corrected HAWK-I images ).
- Period 100, to be used for Period 100 Phase 1 and 2 proposal preparation.
- Period 97, to be used for Period 97 and 98 Phase 1 and 2 proposal preparation.
- HAWK-I Template User Manual
Detailed information on the acquisition, observation, and calibration templates. - Period 111 - , to be used for Period 111 Phase 1 and 2 proposal preparation (no changes from P112 and following periods).
- Period 110, to be used for Period 110 Phase 1 and 2 proposal preparation.
- Period 109, to be used for Period 109 Phase 1 and 2 proposal preparation.
- Period 108, to be used for Period 108 Phase 1 and 2 proposal preparation.
- Period 107, to be used for Period 107 Phase 2 abd DDT proposal preparation.
- Period 106, to be used for Period 106 Phase 1 and 2 proposal preparation.
- Period 105, to be used for Period 105 Phase 1 and 2 proposal preparation.
- Period 104, to be used for Period 104 Phase 1 and 2 proposal preparation.
- Period 103, to be used for Period 103 Phase 1 and 2 proposal preparation.
- Period 100, to be used for Period 100 Phase 1 and 2 proposal preparation.
- Period 97, to be used for Period 97 and 98 Phase 1 and 2 proposal preparation.
- HAWK-I Calibration Plan
Detailed information on the instrument calibration plan.- Period 111 - , to be used for Period 111 Phase 1 and 2 proposal preparation (no changes from P112 and following periods).
- Period 110, to be used for Period 110 Phase 1 and 2 proposal preparation.
- Period 109, to be used for Period 109 Phase 1 and 2 proposal preparation.
- Period 108, to be used for Period 108 Phase 1 and 2 proposal preparation.
- Period 107, to be used for Period 107 Phase 2 abd DDT proposal preparation.
- Period 106, to be used for Period 106 Phase 1 and 2 proposal preparation.
- Period 105, to be used for Period 105 Phase 1 and 2 proposal preparation.
- Period 104, to be used for Period 104 Phase 1 and 2 proposal preparation.
- Period 103, to be used for Period 103 Phase 1 and 2 proposal preparation.
- Period 100, to be used for Period 100 Phase 1 and 2 proposal preparation.
- Period 97, to be used for Period 97 and 98 Phase 1 and 2 proposal preparation.
- HAWK-I Pipeline Manual The HAWK-I pipeline and its manual can be retreived from here.
A list of Frequently Asked Questions on data reduction is also available.