Ultraclean CCD project
Overview table
Material | Washing | Vacuum baking (10-2 mBar) |
|||||
Possible solvent | Hand cleaning | 1. Ultrasonic bath with Tickopur detergent (temperature, duration) | 2. Ultrasonic bath with purewater or non-ultrasonic bath with solvent (temperature, duration) | Maximum temperature | Minimum duration | ||
Fiberglass (modified Epoxy material) | Acetone | no | 85 oC, 30 min. | 35 oC, 30 min. | 120 oC | 16 h | |
Metals (Aluminium parts andstainless steel) | Acetone | yes | 85 oC, 30 min. | 35 oC, 30 min. | 180 oC | 16 h | |
Electronic boards | ZIF-sockets | Alcohol | no | 85 oC, 30 min. | 35 oC, 30 min. | 150 oC | 72 h |
Raw boards | Alcohol | no | 85 oC, 30 min. | 35 oC, 30 min. | 120 oC | 72 h | |
Soldered boards | Alcohol | yes | no | no | 85 oC | 72 h | |
CCDs | EEV | no | no | no | no | 80 oC | 72 h |
Tektronix | no | no | no | no | 55 oC | 72 h | |
MIT / LL | no | no | no | no | 60 oC | 72 h | |
Vacuum connectors | Alcohol | no | 85 oC, 30 min. | 35 oC, 30 min. | 85 oC | 16 h | |
Welded inner tank | Acetone | yes | 85 oC, 30 min. | 35 oC, 30 min. | 85 oC | 72 h | |
CFC inner tank structure | Alcohol | yes | 85 oC, 30 min. | 35 oC, 30 min. | 85 oC | 72 h | |
Painted shields | no (alcohol, only for areas without paint) |
no | no | no | 120 oC | 72 h | |
Glued components | Alcohol | yes | no | no | 120 oC | 72 h | |
VITON O-rings | Alcohol | yes | 85 oC, 30 min. | 35 oC, 30 min. | 120 oC | 16 h | |
Zeolite (sorption pump) | Store in dry atmosphere | no | - | - | 180 - 350 oC | 16 h | |
Active charcoal | Alcohol is possible | no | - | - | 100 oC | 16 h | |
Vacuum pipes | Acetone | yes | 85 oC, 30 min. | 35 oC, 30 min. | 180 oC | 16 h | |
Pumps | Vacuum valve | Alcohol | yes | - | - | 120 oC | 16 h |
Vacuum gauge | Alcohol | yes | - | - | 85 oC | 16 h |
Cryostat integration and final tests
Click here for the Overview of all steps as summary.
Step | Tools | Hints | |
1 | Integration of parts | Gloves | Clean room class 100 |
2 | All O-rings with grease | without gloves | Clean room class 100 |
3 | Pumping | only oil free pumps to 10-2 mBar | |
4 | Leak test | Leak tester | |
5 | Baking of sorption pumps and cold plate in tankalone | Vacuum pump | Cold plate + 40 °C, sorption pump 80 - 200 °C |
6 | Assembly of ready cryostat head with tank | Gloves | Sorption pump and cold plate remains hot; clean room class 100 |
7 | Leak test | Leak tester | |
8 | Baking sorption pump and cold plate | Vacuum pump | |
9 | Cool down test | Liquid nitrogen | Pumping during cooling down with cold-trap |
Back to Ultraclean CCD project