CCD Tests :: 2002-10-23 -- 2002-11-16
The following links provide CCD Test info fo the period 2002-10-23 to 2002-11-16. During this period the CCD Hardware configuration was 2222222222 (see here for details) and there was a noise source believed to be due to the mains power supply at the MPG/ESO-2.20m telescope (which is apparently LESS clean that at the ESO-1.52m).