ELT active segmented mirror

The construction of the ELT is only possible with a segmented primary mirror. Scientists at ESO have developed a test bench called Active Phasing Experiment to study a new phasing technology and a new telescope control system. The key subsystem of this experiment is a scaled down Active Segmented Mirror (ASM) composed of sixty-one hexagonal segments of seventeen millimeters side to side (approximately 100 times smaller than of an ELT segment). Each hexagonal mirror can be controlled in piston, tip and tilt. Here you see the assembly of the ASM model in ... 200..

Bildnachweis:

ESO

Über das Bild

ID:img_5800
Typ:Fotografisch
Veröffentlichungsdatum:3. Dezember 2009 23:18
Größe:4368 x 2912 px

Über das Objekt

Name:Extremely Large Telescope
Typ:Unspecified : Technology : Observatory : Telescope
Kategorie:ELT

Bildformate

Großes JPEG
2,6 MB

Skalierbar


Bildschirm-Hintergrundbilder

1024x768
203,7 KB
1280x1024
326,2 KB
1600x1200
462,7 KB
1920x1200
537,2 KB
2048x1536
746,4 KB