UVES at ESO Headquarters

Closing the instrument - the first darkness : This photo was taken mid-August 1998 after all heavy components had been lifted onto the table and the upper half of the enclosure had been mounted. The engineer is operating the motorized lifting system. In its normal (lowered) position the enclosure provides a light-tight, thermally stable environment for the sensitive optics and detectors inside.

Herkunftsnachweis:

ESO

Über das Bild

ID:eso9839c
Typ:Fotografisch
Veröffentlichungsdatum:7. September 1998
Dazugehörige Veröffentlichungen:eso9839
Größe:2434 x 3000 px

Über das Objekt

Name:ESO HQ Garching, UVES
Typ:Unspecified : Technology : Observatory : Instrument
Unspecified : Technology : Observatory : Facility
Kategorie:Paranal
Premises

Bildformate

Großes JPEG
1,7 MB

Bildschirm-Hintergrundbilder

1024x768
246,2 KB
1280x1024
387,9 KB
1600x1200
536,1 KB
1920x1200
608,4 KB
2048x1536
804,5 KB