Sorry! This page is not yet available in your preferred language, so we're displaying the original version instead.
VLT´s UT2 mirror recoating
Preparations for the recoating the VLT's Unit Telescope 2 (Kueyen) primary mirror (M1). A special crane takes the M1 cell, which weighs 45 tonnes, out of the telescope building. The cleaning of the Very Large Telescope primary mirrors is a very delicate operation which takes place every 18 months and consists in removing the aluminium layer by chemical washing and then recoating the mirror.
Kredit:ESO
O snímku
Id: | eso-p-transport-lv1 |
Typ: | Fotografický |
Datum zveřejnění: | 10. května 2010 10:12 |
Velikost: | 2475 x 1828 px |
O objektu
Jméno: | Paranal, Very Large Telescope |
Typ: | Unspecified : Technology : Observatory : Telescope |
Kategorie: | Paranal |