With the release of the telescope schedule, preparation of Service Mode (SM) observations (Phase 2) starts. The deadline for the submission of the Phase 2 material for Period 98 observations is 4 August 2016.
Phase 2 for Observing Period 98
Published: 06 Jul 2016
Detailed information on Phase 2 observation preparation can be found here. The Phase 2 Proposal Preparation tool (P2PP version 3.4.2 ) released for Period 96 is also valid for the preparation of SM observations for Paranal instruments in Period 98. Further assistance is available via direct e-mail to usd-help.