Paranal: Expected Instrumentation and Facilities to be offered for Period 107 and changes foreseen in Periods 108 and 109
The following instruments are expected to be offered for regular operations in Period 107 (1 April 2021 - 30 September 2021). In addition, the table also shows foreseen changes to take place in Periods 108 or 109.
Telescope | Focus | ||||
---|---|---|---|---|---|
Nasmyth A
|
Cassegrain
|
Nasmyth B
|
Incoherent Combined Coudé | Interferometric
|
|
UT1 (Antu) | Visitor Focus (1) | FORS2 | KMOS | ESPRESSO | |
UT2 (Kueyen) | FLAMES | VISIR | UVES | ||
UT3 (Melipal) | SPHERE | XSHOOTER | CRIRES (3) | ||
UT4 (Yepun) | HAWK-I | ERIS(2) | MUSE | ||
AT1 | |||||
AT2 | |||||
AT3 | |||||
AT4 | |||||
VISTA | VIRCAM (4) | ||||
VST | OmegaCAM (4) |
(1) P106 is the last full period of regular operations
(2) P108 is likely the first full period of regular operations
(3) P107 is likely the first full period of regular operations
(4) P107 is the last full period of regular operations