Sorry! This page is not yet available in your preferred language, so we're displaying the original version instead.
The winding road to Cerro Armazones
This image shows the winding road up to the newly flattened Cerro Armazones site, which engineers levelled with in a series of blasts in June 2014. They aimed to remove a total of 220 000 cubic metres of rock for the 300 x 150 metres platform, in preparation of the construction of the Extremely Large Telescope (ELT).
Crédit:M. Struik (CERN)/ESO
À propos de l'image
Identification: | g0020999-final-cc |
Type: | Photographique |
Date de publication: | 21 septembre 2016 15:29 |
Taille: | 3317 x 1866 px |
À propos de l'objet
Nom: | Cerro Armazones, Extremely Large Telescope |
Type: | Unspecified : Technology : Observatory |
Catégorie: | ELT |