UVES at ESO Headquarters

Closing the instrument - the first darkness : This photo was taken mid-August 1998 after all heavy components had been lifted onto the table and the upper half of the enclosure had been mounted. The engineer is operating the motorized lifting system. In its normal (lowered) position the enclosure provides a light-tight, thermally stable environment for the sensitive optics and detectors inside.

Créditos:

ESO

Sobre a imagem

Id:eso9839c
Tipo:Fotográfico
Data de divulgação:7 de Setembro de 1998
Notícias relacionadas:eso9839
Tamanho:2434 x 3000 px

Sobre o objeto

Nome:ESO HQ Garching, UVES
Tipo:Unspecified : Technology : Observatory : Instrument
Unspecified : Technology : Observatory : Facility
Categoria:Paranal
Premises

Formatos de imagens

JPEG grande
1,7 MB

Papéis de parede

1024x768
246,2 KB
1280x1024
387,9 KB
1600x1200
536,1 KB
1920x1200
608,4 KB
2048x1536
804,5 KB