ESO Signs Contract with Chilean Company for ELT Technical Facility

In March 2018 ESO signed a contract with the engineering and construction company Abengoa Chile to build the ELT Technical Facility at ESO’s Paranal Observatory in northern Chile. This new facility will host the assembly and maintenance facilities for the mirrors of ESO’s Extremely Large Telescope (ELT), as well as all the coating, washing and stripping facilities needed to coat and maintain the reflectivity of the mirrors.

Shown in the picture are, from left to right: Rafael Coloma, Head of the commercial office of the Embassy of Spain to Chile; Sergio Adrián Morrone, CEO of Abengoa Chile; Xavier Barcons, ESO Director General; Ambassador Gabriel Rodríguez, Director of Energy, Science, Technology and Innovation at the Chilean Ministry of Foreign Affairs; and Willy Benz, President of ESO Council.

Źródło:

ESO

O zdjęciu

Identyfikator:ann18014b
Typ:Fotograficzny
Data publikacji:12 marca 2018 14:00
Powiązane ogłoszenia:ann18014
Rozmiar:4472 x 3072 px

O obiekcie

Typ:Unspecified : People
Kategoria:People and Events

Formaty zdjęć

Pełen rozmiar
10,0 MB
Wielki JPEG
1,5 MB
JPEG do druku
1,3 MB

Powiększenie


Tapety

1024x768
188,2 KB
1280x1024
264,7 KB
1600x1200
356,9 KB
1920x1200
411,4 KB
2048x1536
517,1 KB