Sorry! Omdat deze pagina niet beschikbaar is in de taal van uw voorkeur tonen wij de originele pagina.
The winding road to Cerro Armazones
This image shows the winding road up to the newly flattened Cerro Armazones site, which engineers levelled with in a series of blasts in June 2014. They aimed to remove a total of 220 000 cubic metres of rock for the 300 x 150 metres platform, in preparation of the construction of the Extremely Large Telescope (ELT).
Credit:M. Struik (CERN)/ESO
Over de afbeelding
Id: | g0020999-final-cc |
Type: | Fotografisch |
Publicatiedatum: | 21 september 2016 15:29 |
Grootte: | 3317 x 1866 px |
Over het object
Naam: | Cerro Armazones, Extremely Large Telescope |
Type: | Unspecified : Technology : Observatory |
Categorie: | ELT |