The winding road to Cerro Armazones
This image shows the winding road up to the newly flattened Cerro Armazones site, which engineers levelled with in a series of blasts in June 2014. They aimed to remove a total of 220 000 cubic metres of rock for the 300 x 150 metres platform, in preparation of the construction of the Extremely Large Telescope (ELT).
Credit:M. Struik (CERN)/ESO
About the Image
Id: | g0020999-final-cc |
Type: | Photographic |
Release date: | 21 September 2016, 15:29 |
Size: | 3317 x 1866 px |
About the Object
Name: | Cerro Armazones, Extremely Large Telescope |
Type: | Unspecified : Technology : Observatory |
Category: | ELT |