M5 Cell Structure contract signed
At a ceremony at ESO Headquarters in Garching, Germany on 29 November 2019, ESO signed a contract with SENER Aerospacial for the design and production of the cell for the M5 mirror of the Extremely Large Telescope (ELT). The contract was signed by ESO’s Director General Xavier Barcons and theGeneral Director of SENER Aeroespacial José Julián Echevarría.
Credit:ESO
About the Image
Id: | ann19060b |
Type: | Photographic |
Release date: | 2 December 2019, 10:30 |
Related announcements: | ann19060 |
Size: | 5002 x 3335 px |
About the Object
Type: | Unspecified : People |
Category: | ELT People and Events |
Image Formats
Large JPEG
4.2 MB
Publication TIFF 4K
17.7 MB
Publication JPEG
2.6 MB
Screensize JPEG
221.8 KB