Grid connection to Paranal and Armazones
ESO has signed an agreement with the company Grupo SAESA to connect its sites at Cerro Paranal and Cerro Armazones to the Chilean electric power grid. The new connection will reduce costs and provide greater reliability and stability, as well as reduce the observatory’s carbon footprint.
This image shows the path of the grid connection from Paposo to Paranal and Armazones.
Credit:ESO
About the Image
Id: | ann14049a |
Type: | Artwork |
Release date: | 19 June 2014, 18:50 |
Related announcements: | ann14049 |
Size: | 4217 x 3406 px |
About the Object
Name: | Cerro Armazones, Cerro Paranal |
Type: | Unspecified : Technology : Observatory |
Category: | ELT Paranal |
Image Formats
Large JPEG
5.4 MB
Publication TIFF 4K
26.6 MB
Publication JPEG
4.9 MB
Screensize JPEG
471.6 KB