The light beam tunnel from UT4 to the incoherent focus

In the control building, the framework for the outer cladding and roof was being installed. In other parts of that building, installation of the switchboards and transformers of the power supply was also proceeding. Behind the control building is the finished retaining wall.

Credit:

ESO

About the Image

Id:eso9712d
Type:Photographic
Release date:2 June 1997
Related releases:eso9712
Size:504 x 756 px

About the Object

Name:Paranal
Type:Unspecified : Technology : Observatory
Category:Paranal

Image Formats

Large JPEG
187.7 KB
Screensize JPEG
442.1 KB

Wallpapers

1024x768
257.7 KB
1280x1024
360.1 KB
1600x1200
447.2 KB
1920x1200
474.7 KB
2048x1536
605.5 KB