The ELT Prefocal Station contract ceremony
In March 2018 ESO signed a contract with the Spanish company IDOM for the production of a major new component of ESO’s Extremely Large Telescope. The Prefocal Station A Main System will direct the light collected by the telescope’s huge optical system into science instruments and other test equipment. The Prefocal Station also contains parts of the active optics system of the telescope.
This picture shows the ESO Director General, Xavier Barcons, addressing the ceremony.
Credit:ESO/ M.Zamani
About the Image
Id: | ann18017f |
Type: | Photographic |
Release date: | 21 March 2018, 16:00 |
Related announcements: | ann18017 |
Size: | 6720 x 4090 px |
About the Object
Type: | Unspecified : People |
Category: | People and Events |
Image Formats
Large JPEG
5.3 MB
Publication TIFF 4K
14.9 MB
Publication JPEG
1.9 MB
Screensize JPEG
195.7 KB