ESO Signs Contract with Chilean Company for ELT Technical Facility

In March 2018 ESO signed a contract with the engineering and construction company Abengoa Chile to build the ELT Technical Facility at ESO’s Paranal Observatory in northern Chile. This new facility will host the assembly and maintenance facilities for the mirrors of ESO’s Extremely Large Telescope (ELT), as well as all the coating, washing and stripping facilities needed to coat and maintain the reflectivity of the mirrors.

Shown in the picture are, from left to right: Rafael Coloma, Head of the commercial office of the Embassy of Spain to Chile; Sergio Adrián Morrone, CEO of Abengoa Chile; Xavier Barcons, ESO Director General; Ambassador Gabriel Rodríguez, Director of Energy, Science, Technology and Innovation at the Chilean Ministry of Foreign Affairs; and Willy Benz, President of ESO Council.

Crédit:

ESO

À propos de l'image

Identification:ann18014b
Type:Photographique
Date de publication:12 mars 2018 14:00
Annonces en rapport:ann18014
Taille:4472 x 3072 px

À propos de l'objet

Type:Unspecified : People
Catégorie:People and Events

Formats des images

Grand JPEG
1,5 Mio
JPEG taille écran
161,8 Kio

Zoomable


Fonds d'écran

1024x768
188,2 Kio
1280x1024
264,7 Kio
1600x1200
356,9 Kio
1920x1200
411,4 Kio
2048x1536
517,1 Kio