The light beam tunnel from UT4 to the incoherent focus

In the control building, the framework for the outer cladding and roof was being installed. In other parts of that building, installation of the switchboards and transformers of the power supply was also proceeding. Behind the control building is the finished retaining wall.

Kredit:

ESO

O snímku

Id:eso9712d
Typ:Fotografický
Datum zveřejnění:2. června 1997
Související články:eso9712
Velikost:504 x 756 px

O objektu

Jméno:Paranal
Typ:Unspecified : Technology : Observatory
Kategorie:Paranal

Image Formats

největší JPEG
187,7 KB

Pozadí

1024x768
257,7 KB
1280x1024
360,1 KB
1600x1200
447,2 KB
1920x1200
474,7 KB
2048x1536
605,5 KB