Sorry! This page is not yet available in your preferred language, so we're displaying the original version instead.
The light beam tunnel from UT4 to the incoherent focus
In the control building, the framework for the outer cladding and roof was being installed. In other parts of that building, installation of the switchboards and transformers of the power supply was also proceeding. Behind the control building is the finished retaining wall.
Kredit:ESO
O snímku
Id: | eso9712d |
Typ: | Fotografický |
Datum zveřejnění: | 2. června 1997 |
Související články: | eso9712 |
Velikost: | 504 x 756 px |