UVES at ESO Headquarters

Closing the instrument - the first darkness : This photo was taken mid-August 1998 after all heavy components had been lifted onto the table and the upper half of the enclosure had been mounted. The engineer is operating the motorized lifting system. In its normal (lowered) position the enclosure provides a light-tight, thermally stable environment for the sensitive optics and detectors inside.

Crédito:

ESO

Sobre la imagen

Identificador:eso9839c
Tipo:Fotográfico
Fecha de publicación:7 de Septiembre de 1998
Noticias relacionadas:eso9839
Tamaño:2434 x 3000 px

Sobre el objeto

Nombre:ESO HQ Garching, UVES
Tipo:Unspecified : Technology : Observatory : Instrument
Unspecified : Technology : Observatory : Facility
Categoría:Paranal
Premises

Formatos de imagen

JPEG grande
1,7 MB

Fondo de pantalla

1024x768
246,2 KB
1280x1024
387,9 KB
1600x1200
536,1 KB
1920x1200
608,4 KB
2048x1536
804,5 KB