Sorry! This page is not yet available in your preferred language, so we're displaying the original version instead.
UVES at ESO Headquarters
Closing the instrument - the first darkness : This photo was taken mid-August 1998 after all heavy components had been lifted onto the table and the upper half of the enclosure had been mounted. The engineer is operating the motorized lifting system. In its normal (lowered) position the enclosure provides a light-tight, thermally stable environment for the sensitive optics and detectors inside.
Crédit:ESO
À propos de l'image
Identification: | eso9839c |
Type: | Photographique |
Date de publication: | 7 septembre 1998 |
Communiqués de presse en rapport: | eso9839 |
Taille: | 2434 x 3000 px |
À propos de l'objet
Nom: | ESO HQ Garching, UVES |
Type: | Unspecified : Technology : Observatory : Instrument Unspecified : Technology : Observatory : Facility |
Catégorie: | Paranal Premises |