M5 Cell Structure contract signed

At a ceremony at ESO Headquarters in Garching, Germany on 29 November 2019, ESO signed a contract with SENER Aerospacial for the design and production of the cell for the M5 mirror of the Extremely Large Telescope (ELT). The contract was signed by ESO’s Director General Xavier Barcons (on the left) and the General Director of SENER Aeroespacial José Julián Echevarría (on the right).

Credit:

ESO

About the Image

Id:M5cell_barcons_echevarria
Type:Photographic
Release date:2 December 2019, 10:30
Related announcements:ann19060
Size:4841 x 3227 px

About the Object

Name:Meeting
Type:Unspecified : People
Category:ELT
People and Events

Image Formats

Large JPEG
3.8 MB
Screensize JPEG
223.2 KB

Zoomable


Wallpapers

1024x768
261.9 KB
1280x1024
397.5 KB
1600x1200
544.4 KB
1920x1200
636.5 KB
2048x1536
854.4 KB