Difference: PTQATrackerMockUp (2 vs. 3)

Revision 32015-10-06 - DirkPetry

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

PT QA Tracker Mockup

Added:
>
>

Modified Lifecycle

 

Path for no-problem MOUS with pipeline cal. and manual imaging

<-- /editTable -->
Changed:
<
<
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
>
>
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name(s) Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
 
Ready     2015.1.00123.S CL EU M87_Jet_08_TE 8 0/2                        
PartiallyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 1/2 2015/11/02 20:45                      
FullyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15                      
Line: 15 to 19
 
PipelineCalibration JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 03:25 so far   0d 11:20  
ReadyForQA1.5 JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 05:25 so far   0d 14:45  
QA1.5InProgress JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 1d 00:05 so far   1d 11:25  
Changed:
<
<
ReadyForImaging JAO Pipeline B. Kuntz? 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45       0d 11:20 1d 03:25 so far   1d 14:25  
>
>
ReadyForManualImaging JAO Pipeline B. Kuntz? 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45       0d 11:20 1d 03:25 so far   1d 14:25  
 
ManualImaging JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 2d 06:35 so far   2d 17:55  
ReadyForQA2 JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 00:10 so far   3d 11:30  
QA2InProgress JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 00:15 so far   3d 11:35  
Line: 24 to 28
 
ReadyToDeliver JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 05:25 0d 01:50 so far 4d 19:25  
DeliveryInProgress JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 05:25 1d 02:30 so far 5d 21:55  
Delivered JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00 2015/11/10 05:50 0d 11:20 4d 05:25 1d 11:50 6d 17:25  
Changed:
<
<
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
>
>
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name(s) Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
 
Description of individual columns
Line: 62 to 66
 
    • the executive to which the M/GOUS belongs
  • Pref ARC
    • the preferred ARC
Changed:
<
<
  • SB name
    • the name of the SB
    • this is an active link; clicking on it will open a new tab for the user with the PT search result for this SB
>
>
  • SB Name(s)
    • the name(s) of the SB(s) in the MOUS
    • this is an active link; clicking on the individual SB name will open a new tab for the user with the PT search result for this SB
 
  • Band
    • the frequency band of the SB
  • Num EBs
Changed:
<
<
    • N/M where N is the number of QA0_PASS EBs and M is the number of expected EBs
>
>
    • for each of the SBs in the field "SB Name(s)": N/M where N is the number of QA0_PASS EBs and M is the number of expected EBs, e.g. "2/3"
 
  • Last EB date
    • The date and time when the presently last EB was observed (end of observation)
  • QA0
Line: 126 to 130
 

Path for MOUS with failed pipeline cal. attempt followed by manual cal and manual imaging

<-- /editTable -->
Changed:
<
<
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
>
>
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name(s) Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
 
Ready     2015.1.00123.S CL EU M87_Jet_08_TE 8 0/2                        
PartiallyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 1/2 2015/11/02 20:45                      
FullyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15                      
Line: 148 to 152
 
ReadyToDeliver A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 06:25 0d 01:50 so far 4d 20:25 Pipeline Cal failed CAS-10932
DeliveryInProgress A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 06:25 1d 02:30 so far 5d 23:55 Pipeline Cal failed CAS-10932
Delivered A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00 2015/11/10 05:50 0d 11:20 4d 06:25 1d 11:50 6d 18:25 Pipeline Cal failed CAS-10932
Changed:
<
<
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
>
>
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name(s) Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
 

-- Dirk Petry - 2015-10-05

Line: 156 to 160
 

Comments

<--/commentPlugin-->
Added:
>
>
META FILEATTACHMENT attachment="newlifecycle.pdf" attr="" comment="New MOUS Lifecycle Draft 1" date="1444137052" name="newlifecycle.pdf" path="newlifecycle.pdf" size="23122" user="dpetry" version="2"
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding ARC TWiki? Send feedback