Difference: PTQATrackerMockUp (1 vs. 7)

Revision 72015-10-13 - DirkPetry

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

PT QA Tracker Mockup

Modified Lifecycle

Changed:
<
<
>
>
 

Path for no-problem MOUS with pipeline cal. and manual imaging

Line: 14 to 14
 
Ready     2015.1.00123.S CL EU M87_Jet_08_TE 8 0/2                        
PartiallyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 1/2 2015/11/02 20:45 2015/11/02 23:05                    
FullyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50                    
Changed:
<
<
ReadyForPipelineCal     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50                    
PipelineCalibration JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 03:25 so far   0d 11:20  
ReadyForQA2CalReview JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 05:25 so far   0d 14:45  
QA2CalReviewInProgress JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 1d 00:05 so far   1d 11:25  
ReadyForManualImg JAO Pipeline B. Kuntz? 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45       0d 11:20 1d 03:25 so far   1d 14:25  
ManualImaging JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 2d 06:35 so far   2d 17:55  
ReadyForFinalQA2Review JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 00:10 so far   3d 11:30  
FinalQA2ReviewInProgress JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 00:15 so far   3d 11:35  
>
>
ReadyForPLCalibration     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50                    
PLCalInProgress JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 03:25 so far   0d 11:20  
ReadyForPLCalReview JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 05:25 so far   0d 14:45  
PLCalReviewInProgress JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 1d 00:05 so far   1d 11:25  
PLProductStagingInProgress JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45       0d 11:20 1d 03:25 so far   1d 14:25  
ReadyForManualImaging JAO Pipeline B. Kuntz? 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45       0d 11:20 1d 03:25 so far   1d 14:25  
ManualImagingInProgress JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 2d 06:35 so far   2d 17:55  
ReadyForManualProcReview JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 00:10 so far   3d 11:30  
ManualProcReview JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 00:15 so far   3d 11:35  
 
ReadyForPackaging JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 05:25 0d 00:00 so far 4d 16:45  
PackagingInProgress JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 05:25 0d 00:50 so far 4d 17:35  
Changed:
<
<
ReadyToDeliver JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 05:25 0d 01:50 so far 4d 19:25  
>
>
ReadyForDelivery JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 05:25 0d 01:50 so far 4d 19:25  
 
DeliveryInProgress JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 05:25 1d 02:30 so far 5d 21:55  
Delivered JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00 2015/11/10 05:50 0d 11:20 4d 05:25 1d 11:50 6d 17:25  
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name(s) Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
Line: 134 to 135
 
META FILEATTACHMENT attachment="newlifecycle.pdf" attr="" comment="New MOUS Lifecycle Draft 1" date="1444155783" name="newlifecycle.pdf" path="newlifecycle.pdf" size="23127" user="dpetry" version="3"
META FILEATTACHMENT attachment="newlifecyclev2.pdf" attr="" comment="New MOUS Lifecycle Draft 1" date="1444241068" name="newlifecyclev2.pdf" path="newlifecyclev2.pdf" size="13400" user="dpetry" version="2"
Added:
>
>
META FILEATTACHMENT attachment="newlifecyclev3.pdf" attr="" comment="" date="1444726376" name="newlifecyclev3.pdf" path="newlifecyclev3.pdf" size="16639" user="dpetry" version="1"

Revision 62015-10-07 - DirkPetry

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

PT QA Tracker Mockup

Line: 10 to 10
 

Path for no-problem MOUS with pipeline cal. and manual imaging

<-- /editTable -->
Changed:
<
<
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name(s) Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
>
>
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name(s) Band Num EBs Last EB Date QA0 Cal Start CalReview Imaging Start FinalReview Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
 
Ready     2015.1.00123.S CL EU M87_Jet_08_TE 8 0/2                        
Changed:
<
<
PartiallyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 1/2 2015/11/02 20:45                      
FullyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15                      
QA0InProgress     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15                   0d  
ReadyForProcessing     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50                 0d 02:05  
>
>
PartiallyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 1/2 2015/11/02 20:45 2015/11/02 23:05                    
FullyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50                    
ReadyForPipelineCal     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50                    
 
PipelineCalibration JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 03:25 so far   0d 11:20  
Changed:
<
<
ReadyForQA1.5 JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 05:25 so far   0d 14:45  
QA1.5InProgress JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 1d 00:05 so far   1d 11:25  
ReadyForManualImaging JAO Pipeline B. Kuntz? 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45       0d 11:20 1d 03:25 so far   1d 14:25  
>
>
ReadyForQA2CalReview JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 05:25 so far   0d 14:45  
QA2CalReviewInProgress JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 1d 00:05 so far   1d 11:25  
ReadyForManualImg JAO Pipeline B. Kuntz? 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45       0d 11:20 1d 03:25 so far   1d 14:25  
 
ManualImaging JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 2d 06:35 so far   2d 17:55  
Changed:
<
<
ReadyForQA2 JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 00:10 so far   3d 11:30  
QA2InProgress JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 00:15 so far   3d 11:35  
>
>
ReadyForFinalQA2Review JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 00:10 so far   3d 11:30  
FinalQA2ReviewInProgress JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 00:15 so far   3d 11:35  
 
ReadyForPackaging JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 05:25 0d 00:00 so far 4d 16:45  
PackagingInProgress JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 05:25 0d 00:50 so far 4d 17:35  
ReadyToDeliver JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 05:25 0d 01:50 so far 4d 19:25  
Line: 85 to 84
 
      • yellow: cal in progress
      • green: cal completed, ready for QA1.5
      • red: cal crashed
Changed:
<
<
  • QA1.5
>
>
 
    • The date and time when the inspection of the calibration products began
    • The background colour of the field indicates the system state:
      • white: not yet started
Changed:
<
<
      • yellow: QA1.5 in progress
      • green: QA1.5 pass, ready for imaging
      • red: QA1.5 fail, needs investigation
    • this is an active field; clicking into it will open AQUA in the QA1.5 view for the M/GOUS
>
>
    • this is an active field; clicking into it will open AQUA in the CalReview view for the M/GOUS
 
  • Imaging Start
    • Date and time of the start of the imaging
    • The background colour of the field indicates the system state:
      • white: imaging not yet started
      • yellow: imaging in progress
Changed:
<
<
      • green: imaging completed, ready for QA2
>
>
 
      • red: imaging problem, needs investigation
Changed:
<
<
  • QA2
>
>
 
    • The date and time when the inspection of the imaging products began
    • The background colour of the field indicates the system state:
      • white: not yet started
Changed:
<
<
      • yellow: QA2 in progress
      • green: QA2 pass, ready for packaging
>
>
 
      • red: QA2 fail
Changed:
<
<
    • this is an active field; clicking into it will open AQUA in the QA2 view for the M/GOUS
>
>
    • this is an active field; clicking into it will open AQUA in the QA2 final review view for the M/GOUS
 
  • Delivered on
    • The date and time when the delivery email was sent out
  • Staging Time
Line: 127 to 126
 
    • this is an active field: clicking on it will open a dialog to permit editing the comments
    • in case of negative decisions (user chooses FAIL states in the "State" field), the user is asked to enter a comment here
Deleted:
<
<

Path for MOUS with failed pipeline cal. attempt followed by manual cal and manual imaging

State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name(s) Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
Ready     2015.1.00123.S CL EU M87_Jet_08_TE 8 0/2                        
PartiallyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 1/2 2015/11/02 20:45                      
FullyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15                      
QA0InProgress     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15                   0d  
ReadyForProcessing     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50                 0d 02:05  
PipelineCalibration JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 03:25 so far   0d 11:20  
ReadyForQA1.5 JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 05:25 so far   0d 14:45  
QA1.5Problem JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 05:25 so far   0d 14:45 CAS-10932
ReadyForManualCal A. Heintz?   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 05:25 so far   0d 14:45 CAS-10932
ManualCalibration A. Heintz   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 06:25 so far   0d 15:45 Pipeline Calfailed CAS-10932
ReadyForQA1.5 A. Heintz   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 06:25 so far   0d 15:45 Pipeline Cal failed CAS-10932
QA1.5InProgress A. Heintz   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 1d 01:05 so far   1d 12:25 Pipeline Cal failed CAS-10932
ReadyForImaging A. Heintz   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45       0d 11:20 1d 04:25 so far   1d 15:25 Pipeline Cal failed CAS-10932
ManualImaging A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 2d 07:35 so far   2d 18:55 Pipeline Cal failed CAS-10932
ReadyForQA2 A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 01:10 so far   3d 12:30 Pipeline Cal failed CAS-10932
QA2InProgress A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 01:15 so far   3d 12:35 Pipeline Cal failed CAS-10932
ReadyForPackaging A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 06:25 0d 00:00 so far 4d 17:45 Pipeline Cal failed CAS-10932
PackagingInProgress A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 06:25 0d 00:50 so far 4d 18:35 Pipeline Cal failed CAS-10932
ReadyToDeliver A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 06:25 0d 01:50 so far 4d 20:25 Pipeline Cal failed CAS-10932
DeliveryInProgress A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 06:25 1d 02:30 so far 5d 23:55 Pipeline Cal failed CAS-10932
Delivered A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00 2015/11/10 05:50 0d 11:20 4d 06:25 1d 11:50 6d 18:25 Pipeline Cal failed CAS-10932
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name(s) Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
<-- /editTable -->
 -- Dirk Petry - 2015-10-05

Comments

Revision 52015-10-07 - DirkPetry

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

PT QA Tracker Mockup

Modified Lifecycle

Changed:
<
<
>
>
 

Path for no-problem MOUS with pipeline cal. and manual imaging

Line: 162 to 162
 
<--/commentPlugin-->

META FILEATTACHMENT attachment="newlifecycle.pdf" attr="" comment="New MOUS Lifecycle Draft 1" date="1444155783" name="newlifecycle.pdf" path="newlifecycle.pdf" size="23127" user="dpetry" version="3"
Added:
>
>
META FILEATTACHMENT attachment="newlifecyclev2.pdf" attr="" comment="New MOUS Lifecycle Draft 1" date="1444241068" name="newlifecyclev2.pdf" path="newlifecyclev2.pdf" size="13400" user="dpetry" version="2"

Revision 42015-10-06 - DirkPetry

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

PT QA Tracker Mockup

Line: 161 to 161
 
<--/commentPlugin-->
Changed:
<
<
META FILEATTACHMENT attachment="newlifecycle.pdf" attr="" comment="New MOUS Lifecycle Draft 1" date="1444137052" name="newlifecycle.pdf" path="newlifecycle.pdf" size="23122" user="dpetry" version="2"
>
>
META FILEATTACHMENT attachment="newlifecycle.pdf" attr="" comment="New MOUS Lifecycle Draft 1" date="1444155783" name="newlifecycle.pdf" path="newlifecycle.pdf" size="23127" user="dpetry" version="3"

Revision 32015-10-06 - DirkPetry

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

PT QA Tracker Mockup

Added:
>
>

Modified Lifecycle

 

Path for no-problem MOUS with pipeline cal. and manual imaging

<-- /editTable -->
Changed:
<
<
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
>
>
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name(s) Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
 
Ready     2015.1.00123.S CL EU M87_Jet_08_TE 8 0/2                        
PartiallyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 1/2 2015/11/02 20:45                      
FullyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15                      
Line: 15 to 19
 
PipelineCalibration JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 03:25 so far   0d 11:20  
ReadyForQA1.5 JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 05:25 so far   0d 14:45  
QA1.5InProgress JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 1d 00:05 so far   1d 11:25  
Changed:
<
<
ReadyForImaging JAO Pipeline B. Kuntz? 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45       0d 11:20 1d 03:25 so far   1d 14:25  
>
>
ReadyForManualImaging JAO Pipeline B. Kuntz? 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45       0d 11:20 1d 03:25 so far   1d 14:25  
 
ManualImaging JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 2d 06:35 so far   2d 17:55  
ReadyForQA2 JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 00:10 so far   3d 11:30  
QA2InProgress JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 00:15 so far   3d 11:35  
Line: 24 to 28
 
ReadyToDeliver JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 05:25 0d 01:50 so far 4d 19:25  
DeliveryInProgress JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 05:25 1d 02:30 so far 5d 21:55  
Delivered JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00 2015/11/10 05:50 0d 11:20 4d 05:25 1d 11:50 6d 17:25  
Changed:
<
<
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
>
>
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name(s) Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
 
Description of individual columns
Line: 62 to 66
 
    • the executive to which the M/GOUS belongs
  • Pref ARC
    • the preferred ARC
Changed:
<
<
  • SB name
    • the name of the SB
    • this is an active link; clicking on it will open a new tab for the user with the PT search result for this SB
>
>
  • SB Name(s)
    • the name(s) of the SB(s) in the MOUS
    • this is an active link; clicking on the individual SB name will open a new tab for the user with the PT search result for this SB
 
  • Band
    • the frequency band of the SB
  • Num EBs
Changed:
<
<
    • N/M where N is the number of QA0_PASS EBs and M is the number of expected EBs
>
>
    • for each of the SBs in the field "SB Name(s)": N/M where N is the number of QA0_PASS EBs and M is the number of expected EBs, e.g. "2/3"
 
  • Last EB date
    • The date and time when the presently last EB was observed (end of observation)
  • QA0
Line: 126 to 130
 

Path for MOUS with failed pipeline cal. attempt followed by manual cal and manual imaging

<-- /editTable -->
Changed:
<
<
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
>
>
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name(s) Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
 
Ready     2015.1.00123.S CL EU M87_Jet_08_TE 8 0/2                        
PartiallyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 1/2 2015/11/02 20:45                      
FullyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15                      
Line: 148 to 152
 
ReadyToDeliver A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 06:25 0d 01:50 so far 4d 20:25 Pipeline Cal failed CAS-10932
DeliveryInProgress A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 06:25 1d 02:30 so far 5d 23:55 Pipeline Cal failed CAS-10932
Delivered A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00 2015/11/10 05:50 0d 11:20 4d 06:25 1d 11:50 6d 18:25 Pipeline Cal failed CAS-10932
Changed:
<
<
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
>
>
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name(s) Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
 

-- Dirk Petry - 2015-10-05

Line: 156 to 160
 

Comments

<--/commentPlugin-->
Added:
>
>
META FILEATTACHMENT attachment="newlifecycle.pdf" attr="" comment="New MOUS Lifecycle Draft 1" date="1444137052" name="newlifecycle.pdf" path="newlifecycle.pdf" size="23122" user="dpetry" version="2"

Revision 22015-10-05 - DirkPetry

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

PT QA Tracker Mockup

Line: 15 to 15
 
PipelineCalibration JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 03:25 so far   0d 11:20  
ReadyForQA1.5 JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 05:25 so far   0d 14:45  
QA1.5InProgress JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 1d 00:05 so far   1d 11:25  
Changed:
<
<
ReadyForImaging JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45       0d 11:20 1d 03:25 so far   1d 14:25  
>
>
ReadyForImaging JAO Pipeline B. Kuntz? 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45       0d 11:20 1d 03:25 so far   1d 14:25  
 
ManualImaging JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 2d 06:35 so far   2d 17:55  
ReadyForQA2 JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 00:10 so far   3d 11:30  
QA2InProgress JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 00:15 so far   3d 11:35  
Line: 26 to 26
 
Delivered JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00 2015/11/10 05:50 0d 11:20 4d 05:25 1d 11:50 6d 17:25  
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
Added:
>
>
Description of individual columns

  • State:
    • The present state of the MOUS or GOUS
    • This is an active field: clicking on it will permit to perfrom a (valid) state transition
  • Cal Analyst
    • The person or system to which the calibration of the M/GOUS is assigned (or, if the calibration is already finished: the person or system who did it)
    • A question mark behind the name indicates that the person was contacted and asked if he/she could do the calibration but he/she has not confirmed yet
    • This is an active field if the MOUS is in state "ReadyForProcessing":
      • clicking on it will open a dialog and permit to select an analyst from the database of available analysts
      • once confirmed, the analyst is contacted by email and asked to confirm whether he/she can accept the assignment
      • when the analyst confirms (by logging into the PT and setting the state of the MOUS to"ManualCalibration", he/she is sent the assignment, the question mark behind the name is removed
        • for the purpose of confirmation, the analyst will look at the QA tracker view with only those MOUSs visible which are assigned to him/her or for which assignment has been offered
        • if the analyst is marked as "external" in the database of available analysts, the raw data staging is initiated at the ARC of the analyst
      • if the user selects the analyst "pipeline", the calibration in the pipeline will be initiated
    • If the MOUS is in a state different from "ReadyForProcessing", clicking on the field will only show the email address of the analyst
  • Img Analyst
    • The person or system to which the imaging of the M/GOUS is assigned (or, if the imaging is already finished: the person or system who did it)
    • A question mark behind the name indicates that the person was contacted and asked if he/she could do the imaging but he/she has not confirmed yet
    • This is an active field if the MOUS is in state "ReadyForImaging":
      • clicking on it will open a dialog and permit to select an analyst from the database of available analysts
      • once confirmed, the analyst is contacted by email and asked to confirm whether he/she can accept the assignment
      • when the analyst confirms (by logging into the PT and setting the state of the MOUS to "ManualImaging" resp. , he/she is sent the assignment, the question mark behind the name is removed
        • for the purpose of confirmation, the analyst will look at the QA tracker view with only those MOUSs visible which are assigned to him/her or for which assignment has been offered
        • if the analyst is marked as "external" in the database of available analysts, the raw data staging is initiated at the ARC of the analyst * the raw data staging will only be done if the analysts did not do the calibration and there was no change in the data since the calibration was completed * if the calibration was done by the pipeline, then also the pipeline product package will be staged
      • if the user selects the analyst "pipeline", the imaging in the pipeline will be initiated
    • If the MOUS is in a state different from "ReadyForImaging", clicking on the field will only show the email address of the analyst
  • Project ID
    • the project ID, e.g. 2012.1.00123.S
    • this is an active link; clicking on it will open a new tab for the user with project prep ticket
  • Exec
    • the executive to which the M/GOUS belongs
  • Pref ARC
    • the preferred ARC
  • SB name
    • the name of the SB
    • this is an active link; clicking on it will open a new tab for the user with the PT search result for this SB
  • Band
    • the frequency band of the SB
  • Num EBs
    • N/M where N is the number of QA0_PASS EBs and M is the number of expected EBs
  • Last EB date
    • The date and time when the presently last EB was observed (end of observation)
  • QA0
    • The date when the QA0 on the presently last EB was completed
    • this is an active field; clicking into it will open AQUA in the QA0 view for the last EB
  • Cal Start
    • Date and time of the start of the calibration
    • The background colour of the field indicates the system state:
      • white: cal not yet started
      • yellow: cal in progress
      • green: cal completed, ready for QA1.5
      • red: cal crashed
  • QA1.5
    • The date and time when the inspection of the calibration products began
    • The background colour of the field indicates the system state:
      • white: not yet started
      • yellow: QA1.5 in progress
      • green: QA1.5 pass, ready for imaging
      • red: QA1.5 fail, needs investigation
    • this is an active field; clicking into it will open AQUA in the QA1.5 view for the M/GOUS
  • Imaging Start
    • Date and time of the start of the imaging
    • The background colour of the field indicates the system state:
      • white: imaging not yet started
      • yellow: imaging in progress
      • green: imaging completed, ready for QA2
      • red: imaging problem, needs investigation
  • QA2
    • The date and time when the inspection of the imaging products began
    • The background colour of the field indicates the system state:
      • white: not yet started
      • yellow: QA2 in progress
      • green: QA2 pass, ready for packaging
      • red: QA2 fail
    • this is an active field; clicking into it will open AQUA in the QA2 view for the M/GOUS
  • Delivered on
    • The date and time when the delivery email was sent out
  • Staging Time
    • The length of the period of time between the end of the observation and the beginning of the calibration
    • if the calibration hasn't started yet: the period between the end of the observation and the last refresh of the table (+ the text "so far")
  • Analysis Time
    • The length of the period of time between the beginning of the calibration and the end of QA2
    • if QA2 hasn't finished yet: the period between the beginning of the calibration and the last refresh of the table (+ the text "so far")
  • Delivery Time
    • The length of the period of time between the end of QA2 and the completion of the delivery
    • if delivery isn't completed, yet: the period between the end of QA2 and the last refresh of the table (+ the text "so far")
  • Time from Obs to Delivery
    • The total time from the end of observations to the completion of delivery
    • If the delivery hasn't completed, yet: the period between the end of the observation and the last refresh of the table (+ the text "so far")
  • Comments:
    • any comments that were entered
    • this is an active field: clicking on it will open a dialog to permit editing the comments
    • in case of negative decisions (user chooses FAIL states in the "State" field), the user is asked to enter a comment here
 

Path for MOUS with failed pipeline cal. attempt followed by manual cal and manual imaging

Line: 39 to 135
 
PipelineCalibration JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 03:25 so far   0d 11:20  
ReadyForQA1.5 JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 05:25 so far   0d 14:45  
QA1.5Problem JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 05:25 so far   0d 14:45 CAS-10932
Added:
>
>
ReadyForManualCal A. Heintz?   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 05:25 so far   0d 14:45 CAS-10932
 
ManualCalibration A. Heintz   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 06:25 so far   0d 15:45 Pipeline Calfailed CAS-10932
ReadyForQA1.5 A. Heintz   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 06:25 so far   0d 15:45 Pipeline Cal failed CAS-10932
QA1.5InProgress A. Heintz   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 1d 01:05 so far   1d 12:25 Pipeline Cal failed CAS-10932

Revision 12015-10-05 - DirkPetry

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="WebHome"

PT QA Tracker Mockup

Path for no-problem MOUS with pipeline cal. and manual imaging

State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
Ready     2015.1.00123.S CL EU M87_Jet_08_TE 8 0/2                        
PartiallyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 1/2 2015/11/02 20:45                      
FullyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15                      
QA0InProgress     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15                   0d  
ReadyForProcessing     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50                 0d 02:05  
PipelineCalibration JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 03:25 so far   0d 11:20  
ReadyForQA1.5 JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 05:25 so far   0d 14:45  
QA1.5InProgress JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 1d 00:05 so far   1d 11:25  
ReadyForImaging JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45       0d 11:20 1d 03:25 so far   1d 14:25  
ManualImaging JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 2d 06:35 so far   2d 17:55  
ReadyForQA2 JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 00:10 so far   3d 11:30  
QA2InProgress JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 00:15 so far   3d 11:35  
ReadyForPackaging JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 05:25 0d 00:00 so far 4d 16:45  
PackagingInProgress JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 05:25 0d 00:50 so far 4d 17:35  
ReadyToDeliver JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 05:25 0d 01:50 so far 4d 19:25  
DeliveryInProgress JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 05:25 1d 02:30 so far 5d 21:55  
Delivered JAO Pipeline B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00 2015/11/10 05:50 0d 11:20 4d 05:25 1d 11:50 6d 17:25  
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
<-- /editTable -->

Path for MOUS with failed pipeline cal. attempt followed by manual cal and manual imaging

State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
Ready     2015.1.00123.S CL EU M87_Jet_08_TE 8 0/2                        
PartiallyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 1/2 2015/11/02 20:45                      
FullyObserved     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15                      
QA0InProgress     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15                   0d  
ReadyForProcessing     2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50                 0d 02:05  
PipelineCalibration JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 03:25 so far   0d 11:20  
ReadyForQA1.5 JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 05:25 so far   0d 14:45  
QA1.5Problem JAO Pipeline   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 05:25 so far   0d 14:45 CAS-10932
ManualCalibration A. Heintz   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 06:25 so far   0d 15:45 Pipeline Calfailed CAS-10932
ReadyForQA1.5 A. Heintz   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 0d 06:25 so far   0d 15:45 Pipeline Cal failed CAS-10932
QA1.5InProgress A. Heintz   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35         0d 11:20 1d 01:05 so far   1d 12:25 Pipeline Cal failed CAS-10932
ReadyForImaging A. Heintz   2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45       0d 11:20 1d 04:25 so far   1d 15:25 Pipeline Cal failed CAS-10932
ManualImaging A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 2d 07:35 so far   2d 18:55 Pipeline Cal failed CAS-10932
ReadyForQA2 A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 01:10 so far   3d 12:30 Pipeline Cal failed CAS-10932
QA2InProgress A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00     0d 11:20 3d 01:15 so far   3d 12:35 Pipeline Cal failed CAS-10932
ReadyForPackaging A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 06:25 0d 00:00 so far 4d 17:45 Pipeline Cal failed CAS-10932
PackagingInProgress A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 06:25 0d 00:50 so far 4d 18:35 Pipeline Cal failed CAS-10932
ReadyToDeliver A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 06:25 0d 01:50 so far 4d 20:25 Pipeline Cal failed CAS-10932
DeliveryInProgress A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00   0d 11:20 4d 06:25 1d 02:30 so far 5d 23:55 Pipeline Cal failed CAS-10932
Delivered A. Heintz B. Kuntz 2015.1.00123.S CL EU M87_Jet_08_TE 8 2/2 2015/11/03 23:15 2015/11/04 01:50 2015/11/04 10:35 2015/11/05 01:45 2015/11/07 12:00 2015/11/08 16:00 2015/11/10 05:50 0d 11:20 4d 06:25 1d 11:50 6d 18:25 Pipeline Cal failed CAS-10932
State Cal Analyst Img Analyst Project ID Exec Pref ARC SB Name Band Num EBs Last EB Date QA0 Cal Start QA1.5 Imaging Start QA2 Delivered on Staging Time Analysis Time Delivery Time Time from Obs. to Delivery Comments
<-- /editTable -->

-- Dirk Petry - 2015-10-05

Comments

<--/commentPlugin-->
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding ARC TWiki? Send feedback