IRACE for ISAAC |
|||||
|
Status of ISAAC :One complete 4-channel system was delivered in Sep. 1998. Upgrade from 4-channel system to 36-channel system was done in march 2000. Second complete system, but only with 8-channel (2 x AQ board) was delivered in march. 2000 . The CLDC revision 3 (CS-P-1767-3) is used for the short wave detector. The CLDC revision E (CS-P-1767-E) is used for the long wave detector. |
|
|
|
|
|
Upgrade of ISAAC, March 2000: |
|||
|