WBS nr. |
Descriptive Title |
Short description and specific objectives of the
task |
01000 |
Project coordination and management |
Overall coordination of the project and reporting to
the EC |
02000 |
Science requirements |
Consolidation and prioritization of top level requirements
applicable to an ELT |
04000 |
Wavefront control |
Coordination of tasks No 04200 to 04800 |
05000 |
Optical fabrication |
Technical and managerial coordination of tasks 05100
and 05200; reporting to Project Management |
06000 |
Mechanics |
Technical and managerial coordination of tasks 06100
to 06400; reporting to Project Management |
08000 |
Enclosure and infrastructure |
Technical and managerial co-ordination of 08100 and
08300; reporting to Project Management |
09000 |
Adaptive optics |
Technical and managerial co-ordination of 09200 to 09600 |
10000 |
Observatory and science operations |
Analysis of technical and scientific operational scenarios |
11000 |
Instrumentation |
Coordination of tasks 11100 to 11300 |
12000 |
Site characterisation |
Objectives: define the 5 top astronomical sites suitable
to install an ELT under best conditions, and characterise
them. Review, discuss and synthesise the site observations |
13000 |
System layout, integrated modelling |
Technical and managerial coordination of interfaces
to other work packages, reporting to Project Management |