ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 53 to 53
 
  • 1030 Break
  • 1200 alma_reimaging_stoehr.pdf (Felix)
  • 1230 Collection of discussion items, how to feed them back, decide when to meet next
Added:
>
>
 
      • Once per cycle
    • * How to use the resources of the EU ARC better (e.g. involve more EU ARC (Node) staff in Pipeline testing/development)
Line: 67 to 68
 
      • Own import steps
      • Keep flexible development
    • Portable Context
Changed:
<
<
    • Make a continuum subtraction QA score from MOM8FC imaging of line-free channels
>
>
    • Make a continuum subtraction QA score from MOM8FC imaging of line-free channels. Add this score to the AQUA report.
 
    • Adding scores to accept = 'false' runs
    • Passing rms via Pipeline-AQUA report
    • Imaging a few channels in each spectral window
Line: 85 to 86
 
    • ....
  • 1315 End of meeting, lunch
Added:
>
>
 
    • Action (Maurizio): ask about getting tools into Operations testing early August
    • Action (Dirk): ask DRMs about the switch early
    • Action (Suzanna): AQUA demo, DRM-AQUA liasion telecons
 