Difference: ESOPipelineMeeting (1 vs. 24)

Revision 242017-06-06 - ElizabethHumphreys

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 27 to 27
 
Added:
>
>
 
  • 1720 End of day 1

Wednesday 31 May

Line: 49 to 50
 Meeting Dinner: Gasthof Neuwirt, Garching 1830

Thursday 1 June

Changed:
<
<
  • 0930 AQUA plans and needs from Pipeline (Suzanna)
>
>
  • 0930 AQUA plans and needs from Pipeline (Suzanna, ppt is attached below)
 
  • 1030 Break
  • 1200 alma_reimaging_stoehr.pdf (Felix)
  • 1230 Collection of discussion items, how to feed them back, decide when to meet next

Revision 232017-06-06 - SuzannaRandall

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 125 to 125
 
META FILEATTACHMENT attachment="iPlCy4_23may2016.pdf" attr="" comment="" date="1496303097" name="iPlCy4_23may2016.pdf" path="iPlCy4_23may2016.pdf" size="847524" user="ehumphre" version="1"
META FILEATTACHMENT attachment="alma_reimaging_stoehr.pdf" attr="" comment="" date="1496303294" name="alma_reimaging_stoehr.pdf" path="alma_reimaging_stoehr.pdf" size="605506" user="fstoehr" version="1"
META FILEATTACHMENT attachment="PL_talk.pdf" attr="" comment="Slides from Vinod" date="1496303324" name="PL_talk.pdf" path="PL_talk.pdf" size="1579438" user="ehumphre" version="1"
Added:
>
>
META FILEATTACHMENT attachment="aqua_euplmeeting_2017.pptx" attr="" comment="Talk by Suzanna on proposed Cycle 5 workflow and AQUA" date="1496740474" name="aqua_euplmeeting_2017.pptx" path="aqua_euplmeeting_2017.pptx" size="5645028" user="srandall" version="1"

Revision 222017-06-02 - SuzannaRandall

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 53 to 53
 
  • 1030 Break
  • 1200 alma_reimaging_stoehr.pdf (Felix)
  • 1230 Collection of discussion items, how to feed them back, decide when to meet next
Added:
>
>
 
      • Once per cycle
    • * How to use the resources of the EU ARC better (e.g. involve more EU ARC (Node) staff in Pipeline testing/development)
Line: 67 to 68
 
      • Own import steps
      • Keep flexible development
    • Portable Context
Changed:
<
<
    • Make a continuum subtraction QA score from MOM8FC imaging of line-free channels
>
>
    • Make a continuum subtraction QA score from MOM8FC imaging of line-free channels. Add this score to the AQUA report.
 
    • Adding scores to accept = 'false' runs
    • Passing rms via Pipeline-AQUA report
    • Imaging a few channels in each spectral window
Line: 85 to 86
 
    • ....
  • 1315 End of meeting, lunch
Added:
>
>
 
    • Action (Maurizio): ask about getting tools into Operations testing early August
    • Action (Dirk): ask DRMs about the switch early
    • Action (Suzanna): AQUA demo, DRM-AQUA liasion telecons

Revision 212017-06-01 - ElizabethHumphreys

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 37 to 37
 
  • 1230 Lunch

Changed:
<
<
  • 1420 Operations Pipeline at the EU ARC (Vinod)
>
>
 
Line: 51 to 51
 
  • 0930 AQUA plans and needs from Pipeline (Suzanna)
  • 1030 Break
Changed:
<
<
  • 1100 alma_reimaging_stoehr.pdf (Felix)
  • 1130 Collection of discussion items, how to feed them back, decide when to meet next
    • Portable Context
>
>
  • 1200 alma_reimaging_stoehr.pdf (Felix)
  • 1230 Collection of discussion items, how to feed them back, decide when to meet next
      • Once per cycle
    • * How to use the resources of the EU ARC better (e.g. involve more EU ARC (Node) staff in Pipeline testing/development)
      • Example Requirements Document
      • Wish list of PL items people could work on in the ARCs (SSS provides?)
      • Action (Liz): meet with Evanthia and Martin to see what could happen, high level of commitment needed
    • Pipeline "Second Generation" development programme/ working group / discussion
      • Works for all telescopes worldwide?
      • Takes SRDP to the next level?
      • Action (Liz): Gather statistics to see what PIs want/what they are doing: User survey and CASA group, find out how much recalibration etc, pipeline versus manual, tell community
      • Nobeyama and other submm telescopes
      • Vinod could test on ATCA data
      • Own import steps
      • Keep flexible development
    • Portable Context
 
    • Make a continuum subtraction QA score from MOM8FC imaging of line-free channels
    • Adding scores to accept = 'false' runs
    • Passing rms via Pipeline-AQUA report
    • Imaging a few channels in each spectral window
Deleted:
<
<
    • Pipeline "Second Generation" development programme/ working group / discussion
      • Works for all telescopes worldwide?
      • Takes SRDP to the next level?
 
    • Group processing and EU Expertise
    • Export of bad antennas to pipeline-aqua report
    • How to protect antennas from being flagged
Line: 70 to 80
 
    • Documentation improvement, and ask JH to add flagging task information to user documents
    • Use of rem_cloud in wvr correction
    • Issue reporting on SCOPS-1338
Deleted:
<
<
 
    • Add links to CASA Guides to the README
Changed:
<
<
    • Wish list of items people could work on in the ARC
>
>
    • Check why NA wants to edit
 
    • ....
Changed:
<
<
  • 1230 End of meeting, lunch
>
>
  • 1315 End of meeting, lunch

    • Action (Maurizio): ask about getting tools into Operations testing early August
    • Action (Dirk): ask DRMs about the switch early
    • Action (Suzanna): AQUA demo, DRM-AQUA liasion telecons
    • Action (DRM+Maurizio): how to get manual into AQUA
    • Action (Maurizio+Suzanna+Dirk): Create poor mans weblog in AQUA for manual, Suzanna knows where, DRM will review after cal+imaging
    • Action (Suzanna): send ticket to Dirk
    • Action (Dirk): send example package to Suzanna
    • Action(Dirk, Suzanna, Maurizio): continue discussion offline
    • Action (Suzanna): Make sure it is easy to just change e.g. the data reducer, but Dirk should test what is there already first. Can batch script changes

syscal editing versioning

  -- Elizabeth Humphreys - 2017-05-21
Line: 101 to 123
 
META FILEATTACHMENT attachment="ARCPipelineMeeting.pdf" attr="" comment="Slides from Sandra Castro" date="1496302638" name="ARCPipelineMeeting.pdf" path="ARCPipelineMeeting.pdf" size="693872" user="ehumphre" version="1"
META FILEATTACHMENT attachment="iPlCy4_23may2016.pdf" attr="" comment="" date="1496303097" name="iPlCy4_23may2016.pdf" path="iPlCy4_23may2016.pdf" size="847524" user="ehumphre" version="1"
META FILEATTACHMENT attachment="alma_reimaging_stoehr.pdf" attr="" comment="" date="1496303294" name="alma_reimaging_stoehr.pdf" path="alma_reimaging_stoehr.pdf" size="605506" user="fstoehr" version="1"
Added:
>
>
META FILEATTACHMENT attachment="PL_talk.pdf" attr="" comment="Slides from Vinod" date="1496303324" name="PL_talk.pdf" path="PL_talk.pdf" size="1579438" user="ehumphre" version="1"

Revision 202017-06-01 - FelixStoehr

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 51 to 51
 
  • 0930 AQUA plans and needs from Pipeline (Suzanna)
  • 1030 Break
Changed:
<
<
  • 1100 Archive and the re-imaging project (Felix)
>
>
 
  • 1130 Collection of discussion items, how to feed them back, decide when to meet next
    • Portable Context
    • Make a continuum subtraction QA score from MOM8FC imaging of line-free channels
Line: 100 to 100
 
META FILEATTACHMENT attachment="PL_talk.key" attr="" comment="" date="1496302484" name="PL_talk.key" path="PL_talk.key" size="3163915" user="varumuga" version="1"
META FILEATTACHMENT attachment="ARCPipelineMeeting.pdf" attr="" comment="Slides from Sandra Castro" date="1496302638" name="ARCPipelineMeeting.pdf" path="ARCPipelineMeeting.pdf" size="693872" user="ehumphre" version="1"
META FILEATTACHMENT attachment="iPlCy4_23may2016.pdf" attr="" comment="" date="1496303097" name="iPlCy4_23may2016.pdf" path="iPlCy4_23may2016.pdf" size="847524" user="ehumphre" version="1"
Added:
>
>
META FILEATTACHMENT attachment="alma_reimaging_stoehr.pdf" attr="" comment="" date="1496303294" name="alma_reimaging_stoehr.pdf" path="alma_reimaging_stoehr.pdf" size="605506" user="fstoehr" version="1"

Revision 192017-06-01 - ElizabethHumphreys

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 42 to 42
 
Added:
>
>
 
  • 1600 ARC Cheese and Wine
  • 1700 End of day 2
Line: 70 to 71
 
    • Use of rem_cloud in wvr correction
    • Issue reporting on SCOPS-1338
    • How to use the resources of the EU ARC better
Added:
>
>
 
    • Add links to CASA Guides to the README
    • Wish list of items people could work on in the ARC
    • ....
Line: 96 to 98
 
META FILEATTACHMENT attachment="201705_vcg_flagging.pdf" attr="" comment="" date="1496228912" name="201705_vcg_flagging.pdf" path="201705_vcg_flagging.pdf" size="1923821" user="ehumphre" version="1"
META FILEATTACHMENT attachment="APA_Garching2017.pdf" attr="" comment="" date="1496230173" name="APA_Garching2017.pdf" path="APA_Garching2017.pdf" size="1957663" user="fgugliel" version="1"
META FILEATTACHMENT attachment="PL_talk.key" attr="" comment="" date="1496302484" name="PL_talk.key" path="PL_talk.key" size="3163915" user="varumuga" version="1"
Added:
>
>
META FILEATTACHMENT attachment="ARCPipelineMeeting.pdf" attr="" comment="Slides from Sandra Castro" date="1496302638" name="ARCPipelineMeeting.pdf" path="ARCPipelineMeeting.pdf" size="693872" user="ehumphre" version="1"
META FILEATTACHMENT attachment="iPlCy4_23may2016.pdf" attr="" comment="" date="1496303097" name="iPlCy4_23may2016.pdf" path="iPlCy4_23may2016.pdf" size="847524" user="ehumphre" version="1"

Revision 182017-06-01 - varumuga

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 81 to 81
 
<--/commentPlugin-->
Added:
>
>
 
META FILEATTACHMENT attachment="summary_pipelinef2f.pdf" attr="" comment="" date="1496005705" name="summary_pipelinef2f.pdf" path="summary_pipelinef2f.pdf" size="140741" user="ehumphre" version="1"
META FILEATTACHMENT attachment="summary_pipelinef2f_v2.pdf" attr="" comment="" date="1496134999" name="summary_pipelinef2f_v2.pdf" path="summary_pipelinef2f_v2.pdf" size="941203" user="ehumphre" version="1"
META FILEATTACHMENT attachment="ObsModes6.pdf" attr="" comment="Talk by Biggs summarising the Cycle-6 ObsMode meeting" date="1496149557" name="ObsModes6.pdf" path="ObsModes6.pdf" size="138889" user="abiggs" version="2"
Line: 93 to 95
 
META FILEATTACHMENT attachment="pipeline_flagging_2_FINAL.pdf" attr="" comment="Second Flagging Report from Italian ARC Node" date="1496227974" name="pipeline_flagging_2_FINAL.pdf" path="pipeline_flagging_2_FINAL.pdf" size="1856519" user="ehumphre" version="1"
META FILEATTACHMENT attachment="201705_vcg_flagging.pdf" attr="" comment="" date="1496228912" name="201705_vcg_flagging.pdf" path="201705_vcg_flagging.pdf" size="1923821" user="ehumphre" version="1"
META FILEATTACHMENT attachment="APA_Garching2017.pdf" attr="" comment="" date="1496230173" name="APA_Garching2017.pdf" path="APA_Garching2017.pdf" size="1957663" user="fgugliel" version="1"
Added:
>
>
META FILEATTACHMENT attachment="PL_talk.key" attr="" comment="" date="1496302484" name="PL_talk.key" path="PL_talk.key" size="3163915" user="varumuga" version="1"

Revision 172017-06-01 - ElizabethHumphreys

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 38 to 38
 
Changed:
<
<
  • 1440 AQUA Pipeline Agent (Fabrizia)
>
>
 
Line: 52 to 52
 
  • 1030 Break
  • 1100 Archive and the re-imaging project (Felix)
  • 1130 Collection of discussion items, how to feed them back, decide when to meet next
Added:
>
>
    • Portable Context
 
    • Make a continuum subtraction QA score from MOM8FC imaging of line-free channels
    • Adding scores to accept = 'false' runs
    • Passing rms via Pipeline-AQUA report

Revision 162017-05-31 - ElizabethHumphreys

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 36 to 36
 
  • 1145 Issues related to 7m array and SD, group processing (Thomas Stanke) - cancelled
  • 1230 Lunch
Changed:
<
<
  • 1400 Practical issues in the EU Distributed System (Federica Palla)
>
>
 

Revision 152017-05-31 - DirkPetry

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 84 to 84
 
META FILEATTACHMENT attachment="summary_pipelinef2f_v2.pdf" attr="" comment="" date="1496134999" name="summary_pipelinef2f_v2.pdf" path="summary_pipelinef2f_v2.pdf" size="941203" user="ehumphre" version="1"
META FILEATTACHMENT attachment="ObsModes6.pdf" attr="" comment="Talk by Biggs summarising the Cycle-6 ObsMode meeting" date="1496149557" name="ObsModes6.pdf" path="ObsModes6.pdf" size="138889" user="abiggs" version="2"
META FILEATTACHMENT attachment="PLWGactivities_EUARC.pdf" attr="" comment="" date="1496173692" name="PLWGactivities_EUARC.pdf" path="PLWGactivities_EUARC.pdf" size="1392381" user="ehumphre" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="qa2-at-the-euarc-may2017.pdf" attr="" comment="Talk by Dirk Petry" date="1496215448" name="qa2-at-the-euarc-may2017.pdf" path="qa2-at-the-euarc-may2017.pdf" size="1437611" user="dpetry" version="2"
>
>
META FILEATTACHMENT attachment="qa2-at-the-euarc-may2017.pdf" attr="" comment="Talk by Dirk Petry" date="1496231374" name="qa2-at-the-euarc-may2017.pdf" path="qa2-at-the-euarc-may2017.pdf" size="1374414" user="dpetry" version="3"
 
META FILEATTACHMENT attachment="EU_distributed_system.pdf" attr="" comment="" date="1496226693" name="EU_distributed_system.pdf" path="EU_distributed_system.pdf" size="2894421" user="fpalla" version="1"
META FILEATTACHMENT attachment="Interferometry-Imaging-Status-EU-ARC-May-2017.pdf" attr="" comment="" date="1496226901" name="Interferometry-Imaging-Status-EU-ARC-May-2017.pdf" path="Interferometry-Imaging-Status-EU-ARC-May-2017.pdf" size="494068" user="ehumphre" version="1"
META FILEATTACHMENT attachment="Inside_the_Pipeline.pdf" attr="" comment="Stewart Williams" date="1496227346" name="Inside_the_Pipeline.pdf" path="Inside_the_Pipeline.pdf" size="230222" user="ehumphre" version="1"

Revision 142017-05-31 - FabriziaGuglielmetti

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 91 to 91
 
META FILEATTACHMENT attachment="Weblog_HPC.pdf" attr="" comment="" date="1496227515" name="Weblog_HPC.pdf" path="Weblog_HPC.pdf" size="191874" user="ehumphre" version="1"
META FILEATTACHMENT attachment="pipeline_flagging_2_FINAL.pdf" attr="" comment="Second Flagging Report from Italian ARC Node" date="1496227974" name="pipeline_flagging_2_FINAL.pdf" path="pipeline_flagging_2_FINAL.pdf" size="1856519" user="ehumphre" version="1"
META FILEATTACHMENT attachment="201705_vcg_flagging.pdf" attr="" comment="" date="1496228912" name="201705_vcg_flagging.pdf" path="201705_vcg_flagging.pdf" size="1923821" user="ehumphre" version="1"
Added:
>
>
META FILEATTACHMENT attachment="APA_Garching2017.pdf" attr="" comment="" date="1496230173" name="APA_Garching2017.pdf" path="APA_Garching2017.pdf" size="1957663" user="fgugliel" version="1"

Revision 132017-05-31 - ElizabethHumphreys

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 22 to 22
 
Changed:
<
<
  • 1500 Imaging Pipeline: status and plans (Dirk Muders)
>
>
 
  • 1600 Break
  • 1620 Weblog status and plans (Stewart Williams)
Added:
>
>
 
  • 1720 End of day 1

Wednesday 31 May

Changed:
<
<
  • 0930 Automated flagging in Pipeline, calibration pipeline plans (Vincent Geers)
>
>
 
Changed:
<
<
  • 1145 Issues related to 7m array and SD, group processing (Thomas Stanke)
>
>
  • 1145 Issues related to 7m array and SD, group processing (Thomas Stanke) - cancelled
 
  • 1230 Lunch

  • 1400 Practical issues in the EU Distributed System (Federica Palla)
Changed:
<
<
  • 1420 Operations Pipeline at the EU ARC (Fabrizia/Vinod)
  • 1440 AQUA Pipeline Agent (Fabrizia/Vinod)
>
>
  • 1420 Operations Pipeline at the EU ARC (Vinod)
  • 1440 AQUA Pipeline Agent (Fabrizia)
 
Added:
>
>
 
  • 1520 Discussion/Break
  • 1600 ARC Cheese and Wine
  • 1700 End of day 2
Changed:
<
<
Meeting Dinner: Gasthof Neuwirt, Garching
>
>
Meeting Dinner: Gasthof Neuwirt, Garching 1830
 

Thursday 1 June

  • 0930 AQUA plans and needs from Pipeline (Suzanna)
Line: 53 to 56
 
    • Adding scores to accept = 'false' runs
    • Passing rms via Pipeline-AQUA report
    • Imaging a few channels in each spectral window
Changed:
<
<
    • Pipeline "Second Generation" development programme/ working group / discussion
      • Works for all telescopes worldwide?
      • Takes SRDP to the next level?
>
>
    • Pipeline "Second Generation" development programme/ working group / discussion
      • Works for all telescopes worldwide?
      • Takes SRDP to the next level?
 
    • Group processing and EU Expertise
    • Export of bad antennas to pipeline-aqua report
    • How to protect antennas from being flagged
Line: 65 to 68
 
    • Documentation improvement, and ask JH to add flagging task information to user documents
    • Use of rem_cloud in wvr correction
    • Issue reporting on SCOPS-1338
Changed:
<
<
    • How to use the resources of the EU ARC better
>
>
    • How to use the resources of the EU ARC better
 
    • Add links to CASA Guides to the README
Added:
>
>
    • Wish list of items people could work on in the ARC
 
    • ....
  • 1230 End of meeting, lunch
Line: 82 to 86
 
META FILEATTACHMENT attachment="PLWGactivities_EUARC.pdf" attr="" comment="" date="1496173692" name="PLWGactivities_EUARC.pdf" path="PLWGactivities_EUARC.pdf" size="1392381" user="ehumphre" version="1"
META FILEATTACHMENT attachment="qa2-at-the-euarc-may2017.pdf" attr="" comment="Talk by Dirk Petry" date="1496215448" name="qa2-at-the-euarc-may2017.pdf" path="qa2-at-the-euarc-may2017.pdf" size="1437611" user="dpetry" version="2"
META FILEATTACHMENT attachment="EU_distributed_system.pdf" attr="" comment="" date="1496226693" name="EU_distributed_system.pdf" path="EU_distributed_system.pdf" size="2894421" user="fpalla" version="1"
Added:
>
>
META FILEATTACHMENT attachment="Interferometry-Imaging-Status-EU-ARC-May-2017.pdf" attr="" comment="" date="1496226901" name="Interferometry-Imaging-Status-EU-ARC-May-2017.pdf" path="Interferometry-Imaging-Status-EU-ARC-May-2017.pdf" size="494068" user="ehumphre" version="1"
META FILEATTACHMENT attachment="Inside_the_Pipeline.pdf" attr="" comment="Stewart Williams" date="1496227346" name="Inside_the_Pipeline.pdf" path="Inside_the_Pipeline.pdf" size="230222" user="ehumphre" version="1"
META FILEATTACHMENT attachment="Weblog_HPC.pdf" attr="" comment="" date="1496227515" name="Weblog_HPC.pdf" path="Weblog_HPC.pdf" size="191874" user="ehumphre" version="1"
META FILEATTACHMENT attachment="pipeline_flagging_2_FINAL.pdf" attr="" comment="Second Flagging Report from Italian ARC Node" date="1496227974" name="pipeline_flagging_2_FINAL.pdf" path="pipeline_flagging_2_FINAL.pdf" size="1856519" user="ehumphre" version="1"
META FILEATTACHMENT attachment="201705_vcg_flagging.pdf" attr="" comment="" date="1496228912" name="201705_vcg_flagging.pdf" path="201705_vcg_flagging.pdf" size="1923821" user="ehumphre" version="1"

Revision 122017-05-31 - fpalla

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 81 to 81
 
META FILEATTACHMENT attachment="ObsModes6.pdf" attr="" comment="Talk by Biggs summarising the Cycle-6 ObsMode meeting" date="1496149557" name="ObsModes6.pdf" path="ObsModes6.pdf" size="138889" user="abiggs" version="2"
META FILEATTACHMENT attachment="PLWGactivities_EUARC.pdf" attr="" comment="" date="1496173692" name="PLWGactivities_EUARC.pdf" path="PLWGactivities_EUARC.pdf" size="1392381" user="ehumphre" version="1"
META FILEATTACHMENT attachment="qa2-at-the-euarc-may2017.pdf" attr="" comment="Talk by Dirk Petry" date="1496215448" name="qa2-at-the-euarc-may2017.pdf" path="qa2-at-the-euarc-may2017.pdf" size="1437611" user="dpetry" version="2"
Added:
>
>
META FILEATTACHMENT attachment="EU_distributed_system.pdf" attr="" comment="" date="1496226693" name="EU_distributed_system.pdf" path="EU_distributed_system.pdf" size="2894421" user="fpalla" version="1"

Revision 112017-05-31 - ElizabethHumphreys

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 37 to 37
 
  • 1400 Practical issues in the EU Distributed System (Federica Palla)
  • 1420 Operations Pipeline at the EU ARC (Fabrizia/Vinod)
  • 1440 AQUA Pipeline Agent (Fabrizia/Vinod)
Changed:
<
<
  • 1500 PLWG activities at the EU ARC (Liz)
>
>
 
  • 1520 Discussion/Break
  • 1600 ARC Cheese and Wine
  • 1700 End of day 2
Line: 49 to 49
 
  • 1030 Break
  • 1100 Archive and the re-imaging project (Felix)
  • 1130 Collection of discussion items, how to feed them back, decide when to meet next
Changed:
<
<
    • Make a continuum subtraction QA score from MOM0FC imaging of line-free channels
>
>
    • Make a continuum subtraction QA score from MOM8FC imaging of line-free channels
 
    • Adding scores to accept = 'false' runs
    • Passing rms via Pipeline-AQUA report
    • Imaging a few channels in each spectral window
    • Pipeline "Second Generation" development programme/ working group / discussion
      • Works for all telescopes worldwide?
      • Takes SRDP to the next level?
Changed:
<
<
    • ...
>
>
    • Group processing and EU Expertise
    • Export of bad antennas to pipeline-aqua report
    • How to protect antennas from being flagged
    • Flagging dry run capability?
    • Visibility Outlier work
    • Investigation of how consequential flagging is
    • Documentation improvement, and ask JH to add flagging task information to user documents
    • Use of rem_cloud in wvr correction
    • Issue reporting on SCOPS-1338
    • How to use the resources of the EU ARC better
    • Add links to CASA Guides to the README
    • ....
 
  • 1230 End of meeting, lunch

-- Elizabeth Humphreys - 2017-05-21

Revision 102017-05-31 - DirkPetry

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 29 to 29
 

Wednesday 31 May

  • 0930 Automated flagging in Pipeline, calibration pipeline plans (Vincent Geers)
Changed:
<
<
  • 1030 QA2 at the EU ARC (Dirk Petry)
>
>
 
  • 1130 Break
  • 1145 Issues related to 7m array and SD, group processing (Thomas Stanke)
  • 1230 Lunch
Line: 69 to 70
 
META FILEATTACHMENT attachment="summary_pipelinef2f_v2.pdf" attr="" comment="" date="1496134999" name="summary_pipelinef2f_v2.pdf" path="summary_pipelinef2f_v2.pdf" size="941203" user="ehumphre" version="1"
META FILEATTACHMENT attachment="ObsModes6.pdf" attr="" comment="Talk by Biggs summarising the Cycle-6 ObsMode meeting" date="1496149557" name="ObsModes6.pdf" path="ObsModes6.pdf" size="138889" user="abiggs" version="2"
META FILEATTACHMENT attachment="PLWGactivities_EUARC.pdf" attr="" comment="" date="1496173692" name="PLWGactivities_EUARC.pdf" path="PLWGactivities_EUARC.pdf" size="1392381" user="ehumphre" version="1"
Added:
>
>
META FILEATTACHMENT attachment="qa2-at-the-euarc-may2017.pdf" attr="" comment="Talk by Dirk Petry" date="1496215448" name="qa2-at-the-euarc-may2017.pdf" path="qa2-at-the-euarc-may2017.pdf" size="1437611" user="dpetry" version="2"

Revision 92017-05-30 - ElizabethHumphreys

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 68 to 68
 
META FILEATTACHMENT attachment="summary_pipelinef2f.pdf" attr="" comment="" date="1496005705" name="summary_pipelinef2f.pdf" path="summary_pipelinef2f.pdf" size="140741" user="ehumphre" version="1"
META FILEATTACHMENT attachment="summary_pipelinef2f_v2.pdf" attr="" comment="" date="1496134999" name="summary_pipelinef2f_v2.pdf" path="summary_pipelinef2f_v2.pdf" size="941203" user="ehumphre" version="1"
META FILEATTACHMENT attachment="ObsModes6.pdf" attr="" comment="Talk by Biggs summarising the Cycle-6 ObsMode meeting" date="1496149557" name="ObsModes6.pdf" path="ObsModes6.pdf" size="138889" user="abiggs" version="2"
Added:
>
>
META FILEATTACHMENT attachment="PLWGactivities_EUARC.pdf" attr="" comment="" date="1496173692" name="PLWGactivities_EUARC.pdf" path="PLWGactivities_EUARC.pdf" size="1392381" user="ehumphre" version="1"

Revision 82017-05-30 - ElizabethHumphreys

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 49 to 49
 
  • 1030 Break
  • 1100 Archive and the re-imaging project (Felix)
  • 1130 Collection of discussion items, how to feed them back, decide when to meet next
Added:
>
>
    • Make a continuum subtraction QA score from MOM0FC imaging of line-free channels
    • Adding scores to accept = 'false' runs
    • Passing rms via Pipeline-AQUA report
    • Imaging a few channels in each spectral window
    • Pipeline "Second Generation" development programme/ working group / discussion
      • Works for all telescopes worldwide?
      • Takes SRDP to the next level?
    • ...
 
  • 1230 End of meeting, lunch

-- Elizabeth Humphreys - 2017-05-21

Revision 72017-05-30 - ElizabethHumphreys

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 12 to 12
 

Participants

  • External: Dirk Muders (Bonn), Stewart Williams (Edinburgh), Vincent Geers (Edinburgh)
Changed:
<
<
  • ESO:
>
>
  • ESO: Federica, Dirk, Vinod, Vincent, Sandra, Fabrizia, Wolfgang, Andy, Liz, Martin, Suzanna, Felix, Federico, Paola
 

Meeting Dinner

  • Gasthof Neuwirt, Garching, Wednesday 31 May
  • Website

Revision 62017-05-30 - abiggs

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 20 to 20
 

Tuesday 30 May

  • 1400 Welcome and introductions (Martin), purpose of meeting (Liz)
Changed:
<
<
  • 1420 Summary of decisions from the Obsmode meeting (Andy)
>
>
 
Line: 59 to 59
 
META FILEATTACHMENT attachment="summary_pipelinef2f.pdf" attr="" comment="" date="1496005705" name="summary_pipelinef2f.pdf" path="summary_pipelinef2f.pdf" size="140741" user="ehumphre" version="1"
META FILEATTACHMENT attachment="summary_pipelinef2f_v2.pdf" attr="" comment="" date="1496134999" name="summary_pipelinef2f_v2.pdf" path="summary_pipelinef2f_v2.pdf" size="941203" user="ehumphre" version="1"
Changed:
<
<
META FILEATTACHMENT attachment="ObsModes6.pdf" attr="" comment="Talk by Biggs summarising the Cycle-6 ObsMode meeting" date="1496145817" name="ObsModes6.pdf" path="ObsModes6.pdf" size="138861" user="abiggs" version="1"
>
>
META FILEATTACHMENT attachment="ObsModes6.pdf" attr="" comment="Talk by Biggs summarising the Cycle-6 ObsMode meeting" date="1496149557" name="ObsModes6.pdf" path="ObsModes6.pdf" size="138889" user="abiggs" version="2"

Revision 52017-05-30 - abiggs

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 59 to 59
 
META FILEATTACHMENT attachment="summary_pipelinef2f.pdf" attr="" comment="" date="1496005705" name="summary_pipelinef2f.pdf" path="summary_pipelinef2f.pdf" size="140741" user="ehumphre" version="1"
META FILEATTACHMENT attachment="summary_pipelinef2f_v2.pdf" attr="" comment="" date="1496134999" name="summary_pipelinef2f_v2.pdf" path="summary_pipelinef2f_v2.pdf" size="941203" user="ehumphre" version="1"
Added:
>
>
META FILEATTACHMENT attachment="ObsModes6.pdf" attr="" comment="Talk by Biggs summarising the Cycle-6 ObsMode meeting" date="1496145817" name="ObsModes6.pdf" path="ObsModes6.pdf" size="138861" user="abiggs" version="1"

Revision 42017-05-30 - ElizabethHumphreys

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 21 to 21
 
  • 1400 Welcome and introductions (Martin), purpose of meeting (Liz)
  • 1420 Summary of decisions from the Obsmode meeting (Andy)
Changed:
<
<
>
>
 
  • 1500 Imaging Pipeline: status and plans (Dirk Muders)
  • 1600 Break
  • 1620 Weblog status and plans (Stewart Williams)
Line: 58 to 58
 
<--/commentPlugin-->

META FILEATTACHMENT attachment="summary_pipelinef2f.pdf" attr="" comment="" date="1496005705" name="summary_pipelinef2f.pdf" path="summary_pipelinef2f.pdf" size="140741" user="ehumphre" version="1"
Added:
>
>
META FILEATTACHMENT attachment="summary_pipelinef2f_v2.pdf" attr="" comment="" date="1496134999" name="summary_pipelinef2f_v2.pdf" path="summary_pipelinef2f_v2.pdf" size="941203" user="ehumphre" version="1"

Revision 32017-05-28 - ElizabethHumphreys

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Line: 12 to 12
 

Participants

  • External: Dirk Muders (Bonn), Stewart Williams (Edinburgh), Vincent Geers (Edinburgh)
Changed:
<
<
  • ESO:
>
>
  • ESO:
 

Meeting Dinner

  • Gasthof Neuwirt, Garching, Wednesday 31 May
  • Website
Line: 21 to 21
 
  • 1400 Welcome and introductions (Martin), purpose of meeting (Liz)
  • 1420 Summary of decisions from the Obsmode meeting (Andy)
Changed:
<
<
  • 1440 Summary of decisions from the Pipeline F2F meeting (Liz)
>
>
 
  • 1500 Imaging Pipeline: status and plans (Dirk Muders)
  • 1600 Break
  • 1620 Weblog status and plans (Stewart Williams)
Line: 56 to 56
 

Comments


<--/commentPlugin-->
Added:
>
>
META FILEATTACHMENT attachment="summary_pipelinef2f.pdf" attr="" comment="" date="1496005705" name="summary_pipelinef2f.pdf" path="summary_pipelinef2f.pdf" size="140741" user="ehumphre" version="1"

Revision 22017-05-21 - ElizabethHumphreys

Line: 1 to 1
 
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Changed:
<
<

Rooms

>
>

Travel to ESO

Meeting Rooms

 

Participants

  • External: Dirk Muders (Bonn), Stewart Williams (Edinburgh), Vincent Geers (Edinburgh)
Changed:
<
<
  • ESO: Dirk Petry, Thomas Stanke, Federica Palle, Fabrizia
>
>
  • ESO:
 

Meeting Dinner

Changed:
<
<
Gasthof Neuwirt, Garching, Wednesday 31 May
>
>
  • Gasthof Neuwirt, Garching, Wednesday 31 May
  • Website
 

Agenda

Tuesday 30 May

  • 1400 Welcome and introductions (Martin), purpose of meeting (Liz)
  • 1420 Summary of decisions from the Obsmode meeting (Andy)
Changed:
<
<
  • 1440 Summary of decisions from the Pipeline F2F meeting (Liz)
>
>
  • 1440 Summary of decisions from the Pipeline F2F meeting (Liz)
 
  • 1500 Imaging Pipeline: status and plans (Dirk Muders)
  • 1600 Break
  • 1620 Weblog status and plans (Stewart Williams)

Revision 12017-05-21 - ElizabethHumphreys

Line: 1 to 1
Added:
>
>
META TOPICPARENT name="WebHome"

ESO Pipeline Meeting, 30 May - 1 June 2017

Rooms

Participants

  • External: Dirk Muders (Bonn), Stewart Williams (Edinburgh), Vincent Geers (Edinburgh)
  • ESO: Dirk Petry, Thomas Stanke, Federica Palle, Fabrizia

Meeting Dinner

Gasthof Neuwirt, Garching, Wednesday 31 May

Agenda

Tuesday 30 May

  • 1400 Welcome and introductions (Martin), purpose of meeting (Liz)
  • 1420 Summary of decisions from the Obsmode meeting (Andy)
  • 1440 Summary of decisions from the Pipeline F2F meeting (Liz)
  • 1500 Imaging Pipeline: status and plans (Dirk Muders)
  • 1600 Break
  • 1620 Weblog status and plans (Stewart Williams)
  • 1720 End of day 1

Wednesday 31 May

  • 0930 Automated flagging in Pipeline, calibration pipeline plans (Vincent Geers)
  • 1030 QA2 at the EU ARC (Dirk Petry)
  • 1130 Break
  • 1145 Issues related to 7m array and SD, group processing (Thomas Stanke)
  • 1230 Lunch

  • 1400 Practical issues in the EU Distributed System (Federica Palla)
  • 1420 Operations Pipeline at the EU ARC (Fabrizia/Vinod)
  • 1440 AQUA Pipeline Agent (Fabrizia/Vinod)
  • 1500 PLWG activities at the EU ARC (Liz)
  • 1520 Discussion/Break
  • 1600 ARC Cheese and Wine
  • 1700 End of day 2

Meeting Dinner: Gasthof Neuwirt, Garching

Thursday 1 June

  • 0930 AQUA plans and needs from Pipeline (Suzanna)
  • 1030 Break
  • 1100 Archive and the re-imaging project (Felix)
  • 1130 Collection of discussion items, how to feed them back, decide when to meet next
  • 1230 End of meeting, lunch

-- Elizabeth Humphreys - 2017-05-21

Comments


<--/commentPlugin-->
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2025 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding ARC TWiki? Send feedback