 |
 |
 |
 |
| VLT M1 Mirror |
Paranal Residencia |
Paranal Residencia Under Construction |
Measuring the Reflectivity of the 8.2-m Zerodur Mirror |
 |
 |
 |
 |
| Rear Side of the M3 Mirror |
M3: Preparations for Mounting |
Lifting of the M3 MELIPAL Mirror |
Preparations for the Mirror Cell Attachment to MELIPAL |
 |
 |
 |
 |
| M3 Mirror in its Cell |
M1 Mirror Cell Removal |
M1 Mirror Cell: Preparation for Transport |
M1 Mirror Cell Transport |
 |
 |
 |
 |
| M3 Tower and M3 Mirror |
M1 Mirror Cell |
M1 Mirror Cell Transport |
M1 Mirror Cell |
 |
 |
 |
 |
| Installed M1 Cell |
MELIPAL Dummy Concrete Mirror |
KUEYEN UVES |
KUEYEN UVES Spectrograph |
 |
 |
 |
 |
| M1 Cell: Moved Up the Mountain |
M1 Cell: Temporary Storage |
Removing the Dummy Mirror Cell |
Nuno Crato Visits Paranal |
 |
 |
 |
 |
| The Crown Prince Couple of Denmark on the platform of ESO's Very Large Telescope |
KMOS on the Very Large Telescope at the time of first light |
UT4 cell and straps |
VLT site testing |
 |
 |
 |
 |
| Rare storm over Paranal |
Filming at Paranal |
Big and Bigger Telescopes |
Paranal Liquid Nitrogen Facility |
 |
 |
 |
 |
| FORS2 at KUEYEN |
Coated MELIPAL Mirror |
Lifting the Mirror |
Control Building and Satellite Antenna |
 |
 |
 |
 |
| Arrival at the MELIPAL Enclosure |
8.2-m Zerodur Mirror Resting in its Cell |
Lifting of the Mirror Cell |
8.2-m Zerodur Mirror |
 |
 |
 |
 |
| Lowering of the M3 MELIPAL Mirror |
Inspecting the Reflective Surface |
Coating Chamber |
FORS2: Testing and Assembly |
 |
 |
 |
 |
| Approaching the Platform |
Dummy M1 Cell |
Dummy M1 Cell is Stored |
M1 Cell with Dummy Mirror |
 |
 |
 |
 |
| M1 Cell Meets MELIPAL Structure |
M1 Cell |
M1 Cell transport |
Active Mirror Supports in VLT M1 Cell |