IRACE for VISTA |
|||||
|
Status of VISTA system:First test system, 32 channel, was delivered to ATC in sep. 2002. Second test system, 32 channel, was delivered to RAL in July 2003. Final 256 channel system has been made and successful tested: |
||
|
||
|
|
|
256 channel system, which includes a master rack and two slave racks | ||
|
||
Slave one, which contains 128 ADC channels | Master rack, which generates sys clock and detector control signals | Slave two, which contains 128 ADC channels |
|