Early construction on VLT

This photo was obtained in mid-September 1994 and shows the work at Cerro Paranal on the foundations for VLT Unit Telescopes no. 1 (background) and 2 (foreground).

The round concrete slab in the front will serve as baseplate on which to build vertical pillars for two circular railway tracks, 9 and 18 metres in diameter, that the rotating 8.2-metre telescope structure will rest on. Around this an outer concrete structure will soon be constructed which will support the telescope enclosure. The two structures will be completely independent, thus ensuring that no vibrations from the activities in the enclosure can be transmitted to the telescope.

The foundations for Unit Telescope no. 1 in the background have advanced further. The final height of the outer structure is indicated by the steel bars. The enclosure now being shipped from Europe will be placed on top of this structure. With a diameter of 35 metres and a total height of almost 40 metres, it will be a most impressive sight when it is ready in May 1995.

The connecting tunnel between the two domes is visible to the right of the centre. The concrete work is about to begin and once the passage is ready, it will be completely buried under the surface. In fact, finally only the four domes will be visible on the top of Paranal; this will ensure the best possible wind flow over the platform and thus reduce wind turbulence that could adversely influence astronomical observations.

Kilde:

ESO

Om billedet

Id:eso9414b
Type:Foto
Udgivelsesdato:29. september 1994
Relaterede pressemeddelelser:eso9414
Størrelse:400 x 306 px

Om objektet

Navn:Paranal, Very Large Telescope
Type:Unspecified : Technology : Observatory : Telescope
Kategori:Paranal

Billedformater

Stor JPEG
106,6 KB
Skrærm JPEG
308,8 KB

Baggrundsbilleder

1024x768
355,6 KB
1280x1024
489,0 KB
1600x1200
645,8 KB
1920x1200
686,4 KB
2048x1536
871,1 KB