• Pupil Ghosts: Between the last Commissioning/Science Verification run (which ended January 30th) and the start of operations in P81, the entrance window to the instrument cryostat suffered a significant degradation and operations began in less than optimum conditions. The problem was resolved during an intervention conducted 2008-08-20 -- 2008-08-24.