Pupil Ghosts:
Between the last Commissioning/Science Verification run (which ended
January 30th) and the start of operations in P81, the entrance window
to the instrument cryostat suffered a significant degradation and
operations began in less than optimum conditions. The problem was
resolved during an intervention conducted 2008-08-20 -- 2008-08-24.