MASS
Campaign February '03 : 09-11 February 2003 |
|
MASS was installed at Paranal in February 2003 (test night) under the guidance of
A. Tokovinin (Assembly and
Check-up). It is located at ground level close to the automated DIMM (West and
East views). Mass is protected during daytime by a reflective
blanket.
Description of the graphs
The central thumbnail is a hardcopy of the user configurable real-time MASS display showing, from top to bottom:
the average flux in aperture D, the scintillation indices in apertures A, D, and differential A-B, the 0.5-25km seeing, tau0, teta0 and a false colour representation of Cn2 vertical
distribution as a function of time.
The post-processing graphs are obtained using scripts developped by A. Tokovinin:
-The floating layer reconstruction assumes 3 layers of unknown altitude and intensity.
-The fixed layer reconstruction assumes 6 layers of known altitude (0.5, 1, 2, 4, 8, 16 km) but of unknown intensity.
-The integrated seeing of the Paranal DIMM is compared to the sum of the turbulence detected by MASS in the layers 0.5-25km and 2-25km
-The coherence time computed from the Paranal DIMM (using local and ECMWF high altitude wind speed) is compared to the MASS tau0.
The floating and fixed layer representations include cloudy sky periods while
the boundary layer and free-atm. seeing plots are built only from data filtered along:
i) relative background < 3% ii) Chi2 < 50 and iii) seeing error < 0.1.
Night beginning |
Graphic data
|
Operations
log Report |
2003-02-10 |
|
Test night
|
2003-02-11 |
|
Test night
|
|
|
|